中文在线А天堂中文在线新版,男朋友整根进去了但我没感觉,女人18毛片A片久久18软件,热RE99久久精品国产66热

Your Position: Home > Support > Update Center

Cleaning and Replacement of Dust-proof Net of Vacuum Oil Filter

2019/8/1??????view:

  1. Clean the entrance dust-proof filter

  Tools needed:

  10mm, 17mm open wrench or socket wrench.

  The dirt shield for blocking coarse particles is located at the inlet flange of the pump (7/57). It should be kept clean to avoid a drop in pumping speed.

  The dirt shield is composed of two metal screen sieves. The outer screen can be seen when the intake pipeline is removed. If it's only slightly dirty, just remove the dirt from the outside of the network. If the net cover is dirty, remove the import valve orchid. To this end, remove the fastening screw at the top of the cylinder block cover (7/51a-52a), loosen the pump foot at the bottom of the cover (7/94a), and remove the cover.

  Remove four screws and remove the intake flange (7/57) and gasket (7/55).

  Remove the clasp from the intake flange (7/57). Remove two metal screen sieves and wash them with appropriate solvent.

  Reload in reverse order. We recommend replacing the original pad with a new pad (7/55).

  warning

  According to the process involved, hazardous substances may spill over from pumps and oils. Take corresponding measures. Comply with safety regulations.

  Important Notes

  When handling used oil, please observe the relevant environmental regulations!

  Watch out

  Used seals must not be installed; new seals must be installed.

  2. Check the anti-return valve

  Tools needed:

  10mm, 17mm open wrench or socket wrench.

  Adjustment ring: 71072333

  To ensure the normal operation of the pump, keep the anti-return valve clean and clean. If the process gas inhaled by the pump contains a large amount of dust or dirt, we strongly recommend that a dust filter be installed before the pump inlet (see Section 1.4).

  First remove the intake pipe.

  Then remove the fastening screw at the top of the cylinder block cover (7/51a-52a), loosen the pump foot at the bottom (7/94a), and remove the cover.

  Remove four screws and remove intake flange (7/57) and gasket (7/55).

  Remove spring and oil return valve.

  If the anti-return valve is too tight, press the spring a little. The upper edge of the anti-ventilation line should be about 1-2 mm from the lower side of the intake port.

  Reload the intake. We recommend replacing the new gasket (7/55).

  The flat side of the anti-return valve is down.

  The large diameter end of the spring is downward and the small diameter end is opposite to the flat side of the anti-return valve. The anti-return oil valve has a ring of sealing line with one side facing up.

  warning

  According to the process involved, hazardous substances may spill over from pumps and oils. Take corresponding measures. Comply with safety regulations.

  Importantly, when dealing with used oil, please observe the relevant environmental regulations!

  Be careful not to install used seals; be sure to install new seals.


荡女小姿的YIN乱生活| 色婷婷一区二区三区四区成人网| 无码欧美毛片一区二区三| 末成年女A片一区二区| AV无码AV高潮AV喷吹免费| 亚洲AV无码成人精品国产| 全部删除看过的历史记录| 人妻少妇边接电话边娇喘| 久久久久久亚洲AV成人无码国产 | 亚洲中文字幕在线| 全黄H全肉1V1各种姿势| 国产男女爽爽爽免费视频| 豆奶视频在线观看免费高清版| 欧美VPSWINDOWS另类| 麻花豆传媒剧国产MV在线下| 天堂资源中文最新版在线一区| 两个女人互添下身高潮| 久久婷婷色综合一区二区| 久久精品夜色国产亚洲AV| 肉乳床欢无码A片A片120秒| 欧美精品乱码99久久蜜桃| 最近中文字幕2019视频1| 色婷婷综合中文久久一本 | ASSFREE疯狂老妇熟女| 伊人久久大香线蕉AV不卡| 性无码一区二区三区在线观看| 久久精品人妻无码一区二区三区盗| 丰满人妻一区二区三区视频53 | 国产精品久久久久精品香蕉| 亚洲精品久久久口爆吞精| 吃饭时把腿张开故意让公| 中文字幕无码成人免费视频| 国产精品高潮呻吟AV久久| JLZZ日本人年轻护士出水视频 | 天干夜天干天天天爽视频| 亚洲欧美一区二区三区| 国模无码视频一区二区三区| 天天澡天天狠天干天啪啪小说| 国产精品VA无码一区二区| 人妻精油按摩BD高清中文字幕| 一性一交一伦一片A片庆|